Project

Liwa Plastic Project

for ORPIC

The order

Liwa Plastic Project

For customer ORPIC in Oman we deliver a big amount of control panels (300+) for the Proces and Safety system. These panels will be build in a period of 12 months and in 5 different batches. For every batch, there is an integral hardware and software test, before the panels will be packed and shipped to Oman.

Liwa kast

“A temporary workplace of 400 m² was necessary to complete this huge project.”